Incidents/INC-2026-1240
Entities:Aplis Global Corporation

Incident

Scaffold near-miss — expansion project

Complete ClearPath record: attributes, workflow stage, responsible owner, evidence, linked records, tasks and full audit history.

82%

At risk
Investigation

Record ID

INC-2026-1240

APLIS file no.

2427226.8384.081126

External record ID

BP-HS-2026-1140 (BuildPoint)

Responsible owner

R. Lindqvist

Workflow stage

Escalated

Next key date

Not scheduled

Incident lifecycle

  1. Reported→
  2. Triaged→
  3. Investigating→
  4. Escalated→
  5. Corrective Action→
  6. Resolved→
  7. Closed

Compliance score breakdown

What is driving the at risk rating for Scaffold near-miss — expansion project.

At risk82%
Starting score 100% 18 points deducted across 1 driver
  • Severity: High

    moderate−18

    Open condition contributing to the current rating.

    • • severity: High

Linked property

PROP-0041 — Weston Industrial Park

High
Risk level
High
Open obligations
5 (2 overdue)
Last reviewed
2026-06-21
Health score
79%

No property, location, jurisdiction or unit changes recorded on this record.

Property selection history

Every change to the property, location, jurisdiction or linked units on this record — who changed it, when, and the previous value.

0 changes

Property as originally recorded

Weston Industrial Park

Unchanged since the record was created.

No property changes have been recorded. Any future edit to the property selection is logged here automatically with the acting user and timestamp.

Attachments

All documents attached to this incident — 3 files, 4 versions.

  • Signed source document.pdf

    v2 · 2026-07-08 · S. Patel · 475 KB · 2 versions

    Verified
  • Supporting evidence pack.pdf

    v1 · 2026-09-25 · D. Chen · 1176 KB

    Internal
  • Reviewer sign-off.msg

    v1 · 2026-01-20 · J. Whitfield · 86 KB

    Internal

Record attributes

Every stored field for this record.

Id
INC-2026-1240
Title
Scaffold near-miss — expansion project
Type
Construction
Source
BuildPoint
Occurred
2026-08-11 08:02
Location
Weston Industrial Park
Reporter
N. Sharma
External Ref
BP-HS-2026-1140 (BuildPoint)
Severity
High
Escalated
true
Linked
INV-2026-0009
Status
Investigation

Notes

Internal working notes, visible to authorized users only.

No notes recorded yet.

Access & retention

  • Visibility: role-based, Incidents permissions
  • Retention basis: statutory limitation period + 2 years
  • Legal hold: None active
  • Confidentiality: Internal

Document access log

Every upload and download of evidence attached to this record, with actor and timestamp.

No document uploads or downloads recorded in this session.